All-weather Plastic tracks are high-performance sports surfaces composed of synthetic materials such as polyurethane (PU) or EPDM rubber granules designed to withstand extreme temperatures, heavy use and variable climate conditions.
General types of all-weather tracks:
All plastic polyurethane track - 100% PU layers for superior durability and consistency.
Sandwich system - PU wear layer with elastic rubber linings.
Spray tracks are EPDM granules bonded to PU and coated with a textured spray.
These surfaces are known for their shock absorption, anti-slip properties, weather resistance and seamless construction, making them ideal for stadiums, schools and public sports fields.
Proper maintenance isn't just about cleanliness - it's about maintaining performance, preventing hazards and maximizing the life of your track. Neglecting maintenance can lead to:
Surface cracking and delamination
Loss of elasticity and shock absorption
Debris accumulation leading to drainage problems
Fading or peel line markings
Increased risk of injury in athletes
By adopting a proactive maintenance strategy, you can:
Ensure compliance with world athletics standards
Reduced long-term repair costs
Maintain facility reputation and usability
Athlete support and safety
Equipping your facility with the right tools ensures efficient and effective service.
Recommended Tools:
Water jet or high pressure hose
Soft rotating scrubbers
Wet/dry vacuum
Non-metallic wells
Leaf Blowers
Debris removal nets or rakes
Cleaning materials:
PH-neutral sports detergents
Mold and mildew remover (biodegradable)
PU-suggestion graffiti
Non-abrasive brushes and microfibers
Important: Avoid acid or bleach based chemicals which can damage the polyurethane surface and compromise.
Daily maintenance (if the track is used to a significant extent):
Sweep or whip up dust, sand and leaves.
Check for water or drainage problems.
Clean debris from lane lines and edges.
Weekly service:
Wash the surface with low pressure water and a mild detergent.
Scrub high traffic areas such as sprint lanes, curves and relay areas.
Monthly maintenance:
Inspect surface texture, color fade, and line integrity.
Clear path perimeters to prevent plant growth or erosion.
Bi-annual maintenance:
Carry out a full surface inspection.
Assess splash damage, base separation or delamination.
Check for moss, algae or fungal growth, especially in shaded areas.
Spring
Problems: pollen, plant growth, moisture build-up, net debris
Solutions:
Perform a deep clean to remove organic materials.
Repaint or update faded markings.
Check surface drainage after heavy rains.
Trim nearby vegetation and roots encroaching on edges.
Summer
Problems: UV exposure, high foot traffic, heat damage
Solutions:
Rinse your walkway regularly to reduce dust accumulation.
Apply UV protective coating if required.
Monitor for surface softening or bubbling in extreme heat.
Autumn
Problems: falling leaves, heavy rains, early frost
Solutions:
Remove leaves back to prevent staining and clogging of drains.
Clean the surface regularly to prevent the buildup of organic decay.
Inspect for slip hazards from wet leaves or moss.
Winter
Problems: snow, ice, freeze-thaw cycles
Solutions:
Use plastic shovels or snow blowers to remove snow (never metal).
Avoid salting or chemical departments; use calcium magnesium acetate instead.
Make sure the slope has proper drainage to prevent freezing.
Tip: Always contact your trail material supplier before applying any snow or ice treatment.
Restrict unauthorized access
Install fencing and signage to prevent damage to bicycles, skateboards or animals.
Shoe control
Ensure that track-approved cleats or shoes are used.
Equipment management
Do not drag heavy weight training equipment or hammering equipment across the surface.
Drainage Maintenance
Always maintain internal and peripheral drainage systems.
Shadow and Tree Management
Prune trees to reduce leaf accumulation and prevent root encroachment.
Usage rotation tracking
Alternate training tracks weekly to minimize localized wear.
1.Cracked or blister surface
Causes: thermal stress, poor substrate preparation, improper installation.
Solutions: seal with PU filler or cut and re-cut.
2. Marking of fade lines
Causes: ultraviolet exposure, abrasion.
Solutions: Repainting with PU-compatible sports paint.
3
Causes: clogged drains, uneven base, subsidence.
Solutions: Resurfacing, Unclog drainage, consult a professional.
4. Surface softening or stickiness
Causes: Chemical exposure or excessive heat.
Solutions: Clean immediately and consult manufacturer for possible recoating.

Over time, even with regular cleaning, the surface may require re-lining or straightening to restore its aesthetics and function.
When to recolor the lines:
When the markings disappear before<50% видимости.
Every 5–7 years, depending on the intensity of use.
Surface version:
Recommended every 8–10 years.
Includes sanding, cleaning and applying fine PU color.
Best practices:
Use laser templates for accuracy.
Choose eco-certified, non-slip paint systems.
Allow 24-48 hours to cure before opening track.
To keep your track ready to compete, schedule annual or bi-annual inspections with certified sports flooring specialists.
Inspection overview:
Surface thickness
Friction and slip coefficient
Shock sequence
Drainage function
Linear alignment markings
Splash Resistance and Recovery
Tracks that pass these inspections can be certified for regional or international events according to World Athletics rules, adding credibility to your facility.
Budget Considerations:
| Maintenance element | Frequency | Estimated Cost Range (USD) |
Regular cleaning supplies | Monthly | $100–300 |
Professional deep cleaning | Annually | US$1000–2500 |
Line marking | Every 5–7 years | $2000–4000 |
Surface version | Every 8–10 years | US$20,000–10 |
Verification and Testing | Annually | $500–1200 |
Establish a track maintenance log to record inspections, cleaning and repair dates. This helps with budgeting, warranty claims and performance evaluations.
Q1: Can I use pressure washers to clean the plastic track?
A: Yes, but pressure should be limited to less than 1500 psi and angled downward to avoid damage.
Q2: How to remove chewing gum or oil stains?
A: Use PU compatible commercial stain. Test on a small area first.
Q3: Is it possible to remove snow from the track?
A: Yes, but only with plastic or rubber spades to avoid scratching the surface.
Q4: What shoes are allowed on all-weather tracks?
A: PU tracks support spikes in length ≤6mm. Standard sneakers and lawn shoes are acceptable; There are no cleats and shoes for metal tips.
Q5: How to prevent algae or moss?
A: Clean regularly, trim surrounding trees and apply an antifungal treatment annually in shaded or damp areas.
Maintaining a durable all-weather plastic driveway year-round requires diligence, the right tools, and a proactive strategy. From routine cleaning to seasonal preparation, every step contributes to the safety, performance and longevity of your sports facility.
By following this guide, you will not only enhance the usability of your track, but also reduce long-term costs and enhance the experience for both athletes and spectators. In a world where productivity, safety and sustainability intersect, consistent service is your best competitive advantage.
This website uses cookies to ensure you get the best experience on our website.
Comment
(0)